PAS 1192-2 in Consultation until 31st August

PAS 1192-2 and BS1192:2007 are 2 key documents in the UK’s Level 2 BIM Framework. They are currently both undergoing an update and are under consultation. This means that you get a chance to help shape the future of the industry with your suggestions. Remember, there’s no point complaining about how things work if you haven’t attempted to make them better yourself!

Two key documents at the heart of BIM Level 2, PAS 1192-2 and BS1192:2007, are being revised by BSI with the proposals available for comment until the end of August.

The PAS 1192-2 Specification for information management for the capital/delivery phase of construction projects using building information modelling is available here – and the BS1192:2007 Collaborative production of architectural, engineering and construction information – Code of practices available here.

PAS 1192-2 was originally released in 2013, while BS1192 was last updated in 2008. Both documents are being revised to update out-of-date wording and reduce conflicts between the two standards.

Read the full article here on BIM+

Information delivery – AIM maintenance

Advertisement

Tags: , , , , , , , , ,

About Ben Malone

Information Manager for BIM.Technologies in London

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: